Schedule

Week of 11/20/17 (work hours 7:00am – 3:30pm)

Monday thru Wednesday
• The contractor will be installing the stamped concrete and completing minor punch list work throughout the project area.
• Eversource is scheduled to be onsite moving overhead wires to the new poles.
• NO WORK THURSDAY AND FRIDAY. HAPPY THANKSGIVING!
• Expect minimum lanes closures throughout the project area during working hours.

Week of 11/13/17 (work hours 7:00am – 3:30pm)

Monday thru Friday
The contractor will continue with installing decorative crosswalks in the intersection of Route 31 and Route 275, Monument Hill Rd, and the parking lot of Coventry Corners.
The contractor will be installing the stamped concrete throughout the project area.
The contractor will be cleaning catch basins throughout the project area.
Expect minimum lanes closures throughout the project area during working hours.

Week of 10/23/17 (work hours 6:30am – 3:30pm)

Monday thru Friday
• Stamped concrete between sidewalk and granite curb from Bidwell Spirit Shoppe to Rte. 275
• Preparing parking lots /driveways at 1284 & 1276 Main St., Teleflex Building, and old firehouse building for asphalt paving. Paving is scheduled for Monday Oct. 30th.
• Landscaping throughout project may start on Thursday.
• Minimal lane closures this week.

Week of 10/16/17 (work hours 6:30am – 3:30pm)

Monday thru Friday

  • Placing topsoil throughout the project area.
  • Installing decorative light poles and pulling cable on the SB side of Main Street
  • Placing concrete for the remainder of the sidewalk
  • Reconstructing the parking lot between “Meet Me On Main” and the Teleflex Building
  • Minimal lane closures this week

Week of 10/09/17 (work hours 7:00am – 3:30pm)

Monday thru Friday

The contractor will continue with installing concrete sidewalks through the rock cut area and near 1265 Main St where the precast channel walls are.

The contractor will be working on installing the cover for the existing culvert at 1265 Main St and installing the remaining electrical/communication conduits in this area.

The contractor will begin installing topsoil in various locations throughout the project area.

Expect alternating traffic throughout the project area during working hours.