Author Archives: Shama McCormack

Week of 5/15/17 (work hours 7am – 3:30pm)

The contractor will be installing two 48” diameter concrete pipes across Main St. at the open channel near the “Meet Me On Main” building. Alternating traffic will be in effect – very minor traffic delays.

Construction of granite curb, concrete sidewalk and driveway ramps on the north side of Main Street from 1284 Main Street south to the Bidwell Tavern. Possible minor impacts to traffic. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders.

Week of 4/24/17 (work hours 7am – 3:30pm)

The contractor will be performing drainage work (precast open channel) adjacent to “Meet Me On Main Street” building. Occasional minor impacts on traffic.

Construction of granite curb, concrete sidewalk and underdrain on the north side of Main Street from 1284 Main Street south to the Bidwell Tavern. Occasional minor impacts to traffic. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders.

Week of 4/17/17 (work hours 7am – 3:30pm)

The contractor will be performing drainage work (precast open channel) adjacent to “Meet Me On Main Street” building. There will be no impacts on traffic.

Construction of granite curb, concrete sidewalk and underdrain on the north side of Main Street from 1284 Main Street south to the Bidwell Tavern. Possible minor impacts to traffic. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders.

Week of 3/6/17-3/10/17

During the month of March the contractor will be performing drainage work (precast open channel) adjacent to Meet Me On Main Street.
There will be no work performed on Main Street during this time period therefore there will be NO impacts on traffic.

Week of 1/23/17

During the months of January and February the contractor will be performing drainage work only adjacent to Meet Me On Main Street.

There will be no work performed on Main Street during this time period therefore there will be NO impacts on traffic. The contractor is expected to resume work on January 25th.

There will be some sporadic work by Eversource (utility work) which may cause very minor impacts to traffic.

 

Week of January 9, 2017

During the month of January the contractor will be performing drainage work only adjacent to Meet Me On Main Street.

There will be no work performed on Main Street this month and therefore there will be NO impacts on traffic.

There will be some sporadic work by Eversource (utility work) which may cause very minor impacts to traffic.