Author Archives: Shama McCormack

Week of 6/26/17 (work hours 6am – 3:30pm)

Construction of granite & concrete curb on the north bound side of Main Street in the vicinity of the Bidwell Spirit Shoppe. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders. (Monday thru Wednesday)

Construction of granite curb and concrete sidewalk on the south bound side of Main Street in front of 1209 Main Street (Italian Bistro). Minor impacts to traffic. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders. (Thursday thru Friday)

The contractor will be installing underground drainage pipe in Main Street in the vicinity of the Bidwell Tavern & Meet Me On Main. Minor traffic delays. (All week)

NO CONSTRUCTION ACTIVITY JULY 1 THRU JULY 4

Week of 6/12/17 (work hours 6am – 3:30pm)

Construction of granite curb and concrete sidewalk on the south bound side of Main Street from the Sanborn Property to 1209 Main Street (Italian Bistro). Minor impacts to traffic. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders.

The contractor will be installing underground drainage pipe in Main Street in the vicinity of the Bidwell Tavern & Meet Me On Main. Minor traffic delays.

Week of 6/5/17 (work hours 6am – 3:30pm)

Construction of granite curb and concrete sidewalk on the south bound side of Main Street from 1189 Main St. to 1209 Main Street (Italian Bistro). Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders.

Thursday – The contractor will be installing precast concrete wall sections and headwalls in the large excavation adjacent to the Bidwell Tavern. There will be a large crane on site in the Bidwell Tavern parking area adjacent to Main St. There will be alternating traffic throughout the day – minor traffic delays.

Week of 5/29/17 (work hours 7am – 3:30pm)

No work on Memorial Day
The contractor will be excavating for the twin 48” diameter concrete pipes and precast headwalls on the Bidwell Tavern side of Main Street. Minor impacts to traffic.

Construction of granite curb and concrete sidewalk on the south bound side of Main Street from the church north to 1209 Main Street (Italian Bistro). Minor impacts to traffic. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders.

Construction of granite curb on the northbound side of Main St. opposite the church. Minor impacts to traffic.

April / May 2017

Week of 5/22/17 (work hours 7am – 3:30pm)

The contractor will be installing two 48” diameter concrete pipes across Main St. at the open channel near the “Meet Me On Main” building. Alternating traffic will be in effect – minor traffic delays.

Construction of granite curb and concrete sidewalk on the south bound side of Main Street from the church north to 1209 Main Street (Italian Bistro). Possible minor impacts to traffic. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders.

Week of 5/15/17 (work hours 7am – 3:30pm)

The contractor will be installing two 48” diameter concrete pipes across Main St. at the open channel near the “Meet Me On Main” building. Alternating traffic will be in effect – very minor traffic delays.

Construction of granite curb, concrete sidewalk and driveway ramps on the north side of Main Street from 1284 Main Street south to the Bidwell Tavern. Possible minor impacts to traffic. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders.

Week of 4/24/17 (work hours 7am – 3:30pm)

The contractor will be performing drainage work (precast open channel) adjacent to “Meet Me On Main Street” building. Occasional minor impacts on traffic.

Construction of granite curb, concrete sidewalk and underdrain on the north side of Main Street from 1284 Main Street south to the Bidwell Tavern. Occasional minor impacts to traffic. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders.

Week of 4/17/17 (work hours 7am – 3:30pm)

The contractor will be performing drainage work (precast open channel) adjacent to “Meet Me On Main Street” building. There will be no impacts on traffic.

Construction of granite curb, concrete sidewalk and underdrain on the north side of Main Street from 1284 Main Street south to the Bidwell Tavern. Possible minor impacts to traffic. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders.