Author Archives: Shama McCormack

Week of 09/04/17 (work hours 7:00am – 3:30pm)

Monday NO WORK HOLIDAY

Tuesday thru Friday

Continuing the excavation of the rock cut to lower the new southbound lane to the northbound lane grade and finishing the roadway drainage

Preparing the Precast Open Channel at #1265 Main St. for staining

Minor delays to traffic for alternating traffic throughout the work period hours

Week of 08/21/17 (work hours 6:00am – 3:30pm)

Monday thru Friday

Grading of the Parking lot at #1209 Main St. and the installation of concrete handicap accessible ramps.

Removing existing asphalt and grading of Bidwell Tavern, and Bidwell Package Store parking lots.

Paving of #1209 Main St, Bidwell Tavern, and Bidwell Package Store parking lots.

Continuing the excavation of the rock cut to lower the new southbound lane to the northbound lane grade.

Minor delays to traffic for alternating traffic throughout the work period hours.

Week of 08/14/17 (work hours 6:00am – 3:30pm)

Monday thru Friday

Installation of underground utilities near the precast open channel across the street from Bidwell Tavern.

Grading of the Parking lot at #1209 Main St. and the installation of concrete handicap accessible ramps.

Continuing the excavation of the rock cut to lower the new southbound lane to the northbound lane grade.

Minor delays to traffic for alternating traffic throughout the work period hours.

Week of 7/31/17 (work hours 6am – 5:00pm)

ASPHALT PAVING IS SCHEDULED FOR THE WEEK OF JULY 31ST.

Paving will take place between the church and the Bidwell Tavern.

Alternating traffic will be in effect throughout the week. At certain times driveways and parking areas will be INACESSIBLE. Expect delays and use alternate routes if possible.

If you are concerned about getting trapped in a driveway/parking lot you can park your vehicle in the town lot next to the antique store at 1141 Main Street. This lot is outside the construction area and you will have access to your vehicle at all times.

Week of 7/24/17 (work hours 6am – 4:00pm)

THERE WILL BE ROADWAY CONSTRUCTION FOR THE NEXT TWO WEEKS.

On Monday 7/24 the contractor will continue to excavate down to the subgrade of the new roadway and then the contractor will begin placing new gravel material between the church and the Bidwell Tavern.

Vehicles will be traveling on gravel material for the next week between the church and the Bidwell Tavern. Paving of this area is scheduled for the week of July 31st.

Alternating traffic will be in effect throughout the week. At certain times driveways and parking areas may be inaccessible. The Contractor will coordinate closures with all stakeholders affected.

Week of 7/17/17 (work hours 6am – 4:00pm)

THERE WILL BE ROADWAY CONSTRUCTION FOR THE NEXT THREE WEEKS.

On Monday 7/17 the contractor will begin removing the existing asphalt pavement between the church and the Bidwell Tavern. Following asphalt removal the contractor will excavate down to the grade of the new roadway and then the contractor will begin installing gravel material.

Vehicles will be traveling on gravel material for the next two weeks between the church and the Bidwell Tavern. Paving of this area is scheduled for the week of July 31st.

Alternating traffic will be in effect throughout the week. At certain times driveways and parking areas may be inaccessible. The Contractor will coordinate closures with all stakeholders affected.

Week of 7/10/17 (work hours 6am – 3:30pm)

Construction of granite & concrete curb on the north bound side of Main Street in the vicinity of the Bidwell Spirit Shoppe and the Bidwell Tavern. Temporary closures of driveways / parking areas in this area may be necessary. Contractor will coordinate with stakeholders. Alternating traffic will be in effect throughout the week.

Waterline work on Tuesday in the vicinity of Meet Me On Main on the south bound side of Main Street. Minor traffic delays.

Week of 6/26/17 (work hours 6am – 3:30pm)

Construction of granite & concrete curb on the north bound side of Main Street in the vicinity of the Bidwell Spirit Shoppe. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders. (Monday thru Wednesday)

Construction of granite curb and concrete sidewalk on the south bound side of Main Street in front of 1209 Main Street (Italian Bistro). Minor impacts to traffic. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders. (Thursday thru Friday)

The contractor will be installing underground drainage pipe in Main Street in the vicinity of the Bidwell Tavern & Meet Me On Main. Minor traffic delays. (All week)

NO CONSTRUCTION ACTIVITY JULY 1 THRU JULY 4

Week of 6/12/17 (work hours 6am – 3:30pm)

Construction of granite curb and concrete sidewalk on the south bound side of Main Street from the Sanborn Property to 1209 Main Street (Italian Bistro). Minor impacts to traffic. Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders.

The contractor will be installing underground drainage pipe in Main Street in the vicinity of the Bidwell Tavern & Meet Me On Main. Minor traffic delays.

Week of 6/5/17 (work hours 6am – 3:30pm)

Construction of granite curb and concrete sidewalk on the south bound side of Main Street from 1189 Main St. to 1209 Main Street (Italian Bistro). Temporary closures of driveways / parking areas in this area will be necessary. Contractor will coordinate with stakeholders.

Thursday – The contractor will be installing precast concrete wall sections and headwalls in the large excavation adjacent to the Bidwell Tavern. There will be a large crane on site in the Bidwell Tavern parking area adjacent to Main St. There will be alternating traffic throughout the day – minor traffic delays.