Week of 5/02/2016

  • Sewer Installation work in the vicinity of Lake Street will continue between the hours of 7 am and 3 pm. Traffic maybe delayed due to a lane closure.
  • Roadway Drainage work to install drainage pipes in the vicinity of Lake Street Rte / Stonehouse Road Intersection. Alternating one way traffic will be utilized between the hours of 7 am and 3 pm.
  • Rock removal across the road from Monuments Hill Road will continue. Truck traffic entering and leaving the site will be frequent. Short term full stoppage of traffic is anticipated for public safety during the blasting between the hours of 7 am and 3 pm.

Week of 4/25/2016

  • Sewer Installation work in the vicinity of Lake Street will continue between the hours of 7 am and 3 pm. Traffic maybe delayed due to a lane closure.
  • Roadway Drainage work to install drainage pipes in the vicinity of Lake Street Rte / Stonehouse Road Intersection. Alternating one way traffic will be utilized between the hours of 7 am and 3 pm.
  • Rock removal across the road from Monument Hill Road will continue. Truck traffic entering and leaving the site will be frequent. Short term full stoppage of traffic is anticipated for public safety during the blasting between the hours of 7 am and 3 pm.